Norelco | Securing the future.
FI EN
Norelco logo slogan white

Securing the future.

High quality solutions for safe distribution of electricity with 60 years of experience. See how we build a sustainable tomorrow for future generations.

See what Norelco is made of.

 

Norelco power lines

Energy 

We are your expert partner in the execution of safe and reliable electrical network.

kaksi työntekijää tarkastelee tuloksia

Industry

We offer realiable and competitive solutions for industrial environments. 

kaksi työntekijää tehtaalla

Building

We offer project specific complete distribution solutions for every project.

Norelco products

Efficiency to energy distribution

Self developed and manufactured products meet the highest requirements on the market. Our range includes products for a wide variety of distribution needs. 

Show all products

Norelco in social media

Customer cases

21.4.2022

Nokia Arena, Tampere, Finland

Nokia Arena was built using the electricity distribution systems of Norelco, NorPower 5000 main distribution boards, NorBus 5000 busbar trunking, NorPower 1250 switchboards and NorLine 800 panels.

6.6.2016

Jiangshu Bohui paper machine BM1, China

Jiangsu Bohui Paper Industrial produces packing cartons and other paper products. Norelco delivered the NorPower 5000 motor control centers neede for the control of the BM1 paper machine.

9.3.2015

Ovako Steel, Transformer substation, Imatra, Finland

Norelco delivered a factory made NorSwitch transformer station for Ovako Steel factory. It was installed next to the old pumping station, on a concrete plinth. The building was delivered in two parts which were joined on the site. The transformer station includes two distribution transformers and a warm control room with NorPower 5000 distribution boards.

1.12.2014

Boliden zinc smelter, Odda, Norway

The Boliden zinc smelter in Odda, Norway, produces zinc for the global market. Norelco delivered NorPower 5000 motor control centers with Prfibus and VSD control installed in withdrawable cassettes for an expansion project. 

12.11.2012

RTB Bor Flash smelter, Serbia

RTB Bor flash smelter forms copper into anode-form. The flash smelter furnace and its auxiliary equipment were a project where Norelco delivered the NorPower 5000 process MCC’s, NorBus 5000 busbar ducts and control boxes.

4.7.2011

Keljonlahti power plant, Jyväskylä Finland

Norelco delivered NorPower 5000 process control switchgear for the Keljonlahti power plant in Jyväskylä

4.5.2009

HUS Triangle Hospital, Helsinki, Finland

The HUS triange hospital is home to a day hospital, dialysis treatment unit, magnetic resonance imaging unit and various patient departments and laboratories. There are beds for 210 patients. The area of the building is 25 660 m2 and volume 122 000 m3. Norelco delivered NorPower 5000 main distribution boards, NorBus 5000 busbar ducts and distribution boards for for normal, verified and UPS distribution.


Energy for all phases of life 
– since 1962 

 

Select an industry, an expert and send a message:

| | |

Juha Katainen


+358 50 525 5100
juha.katainen@norelco.fi

Jarkko Hartikainen


+358 50 525 5313
jarkko.hartikainen@norelco.fi

Juhani Forss


+358 40 575 0721
juhani.forss@norelco.fi

Juha Hakkarainen


+358 50 525 5307
juha.hakkarainen@norelco.fi

Seppo Karvinen


+358 50 525 5308
seppo.karvinen@norelco.fi

Jarkko Latonummi


+358 50 525 5312
jarkko.latonummi@norelco.fi

Markku Mikkonen


+358 50 525 5309
markku.mikkonen@norelco.fi